The Upper Floor—Stage 2—the “Hourdis” —Feb 2008

Following on from the previous post, as each of the poutrelles were set in place, all the rest of the hollow concrete blocks were dropped into place between them. Until the concrete is poured, care must be taken when moving around on these blocks—they can crack and fracture by excessive rough treatment, so it is... Continue Reading →

Blog at WordPress.com.

Up ↑

%d bloggers like this: